Resolving unexpected gaps between warranty coverage dates

Randy White
Randy White
  • Updated

When buying warranty coverage, you may run into an unexpected gap between coverage dates. We'll outline what this means and how to fix it.

What the unexpected gap really means

  1. Your actual warranty coverage expires on a specific date

    1. Example: Warranty coverage expires on August 31.

  2. Your integration (e.g. ConnectWise Manage) tells ScalePad CS that your coverage expires at a later date

    1. Example: ConnectWise Manage tells ScalePad CS that warranty coverage expires on September 1.

  3. In ScalePad CS, by default, we use the date after your coverage expires to start your new warranty coverage.

    1. In the case of how ScalePad CS handles conflicting dates, see the Purchase and Expiry dates in ScalePad CS article.

Therefore, ScalePad CS is provided with conflicting dates, and it looks like there's a gap in coverage.

How to fix the coverage "gap"

To see which of your integrations are providing the conflicting expiry dates, click into your hardware asset in ScalePad CS, and look at the list of integrations providing expiry dates.

  1. Navigate to the affected configuration within your integration (e.g. ConnectWise Manage).

  2. Clear the dates that are being pushed to ScalePad CS.

  3. Once this is done, navigate to the Integrations page of the ScalePad Hub and click the green Sync Now icon in the upper right of the page.

Any questions? Reach out to our ScalePad CS support team by submitting a support ticket.
:sparkles: NEW :sparkles: Join our MSP Power-Ups - Free 15-minute micro-workshops + live Q&A with our ScalePad CS experts. Sign up here to reserve your spot.

Was this article helpful?

Yes! No