How ScalePad CS prioritizes data from your integrations

Randy White
Randy White
  • Updated

Manual edits in ScalePad CS

Choose a client, open Manage > Hardware and select the asset to open its details. Use the supported editable field controls to add a reporting override; see Manually editing hardware assets for editable fields and permissions.

An in-app override is separate from the source record. Clearing an override lets the resolved source value apply again. Two-way sync can write supported date overrides back only when the relevant integration supports it and its write-back option is enabled; editing another field does not imply that it will be written back.

Use this guide to learn how ScalePad CS prioritizes each integration for reporting on your hardware assets.

Which integration types are trusted most

ScalePad CS gives certain integrations precedence over others.

What ranks highest is:

  1. ScalePad CS In-app edit

  2. Documentation tool

  3. PSA tool

  4. RMM tool


Duplicate entries from the same integration

If you have multiple entries for one hardware asset syncing from the same integration, the most recent record will take precedence.

Any questions? Reach out to our ScalePad CS support team by submitting a support ticket.
:sparkles: NEW :sparkles: Join our MSP Power-Ups - Free 15-minute micro-workshops + live Q&A with our Lifecycle Manager experts. Sign up here to reserve your spot.

Was this article helpful?

Yes! No